Floor is 50% done.. will be done by next mon..




Spotted a hole! !@!#%^&*




Leftover bamboo strips.. can we sell back to the supplier?? haha..




PaPa installed the water heater for us le.. tedious job man.. at 1st he connected to the wrong switch den we were wondering wat's wrong...... den i got irritated played with all the switches and realised it was connected to one of the light switches instead! took out map of the house tat shows all the electrical connections den managed to connect to the heater switch.. phew!