Friday, November 12, 2010

Reno Updates

Bedroom lock is finally repaired! Floor screeding done too.. wat a long wait! Now mus leave it to dry before installing the bamboo flooring.. usually will take 7-10 days but the longer the better, meaning mus wait long long!






The floor contractor gg to drop by today to check the moisture level.. if everything is ok, next week shd be able to start work..